Mississauga Councillor on McGuinty/Wynne Liberals “You’d think they’d have a brain in their heads” re: gas plant cancellation.

June 29th, 2013  

Perhaps someone with influence in the McGuinty-Wynne malgovernment might wish to pass this along to them —Mississauga Councillor Nando Iannicca blasting them for, well… any number of “screwed up” things.

Mississauga power plant. Councillor to McGuinty-Wynne Liberals “WE didn’t make this mess”

[VIDEO TRANSCRIPT EXCERPT BEGINS]

Councillor Nando Iannicca, General Committee June 26, 2013

I’m tempted to let it go but I can’t.

Councillor Jim Tovey (Chair), General Committee June 26, 2013

[laughs]

Councillor Nando Iannicca, General Committee June 26, 2013

$600 million dollars later, this is a site that we have no claim to. We’re out 2/3rds of a billion dollars as taxpayers.

With respect the local member [inaudible] is the Finance Minister [sic]. It’s his government. They are not, I would say dedicated, but they are not dedicated —we paid $600 million dollars for them, we are not getting parkland there?!

It’s embarrassing!

So Madam Mayor, let’s not waste a lot of time. Refer it back to the Premier. Refer it back to the Minister of Finance. Refer it back to the local MPP —who is one and the same, and tell us when the ribbon cutting is for the parkland that I hope Mississaugans, and all Ontarians are going to receive instead of well, $600 million but we don’t really own the land.

I mean how much more badly could they have screwed up this file?!

And they’re going to sell this to taxpayers? Good luck.

Madam Mayor I hope you and I and the local —aren’t selling this to taxpayers.  We didn’t make this mess.

I’m shocked Madam Mayor. It’s just appalling!

You would think they would know that to clean it up they would get rid of the evidence, give them the park real quick. And we’re done and just for the extra $4 million —we’re already out 2/3rds of a billion, what’s the big deal?!

You’d think they’d have a brain in their heads to at least do that! To cover up the shame!

I’m shocked. I’m just shocked, Madam Mayor.

And here it is falling on you to have to write another letter to tell them what’s obvious.

Get rid of the evidence! Let’s get this horrible chapter in the history of this Province out of here —and to think we have to tell them that.

Oh my goodness! *groan*

Thank you, Madam Mayor. Thank you Mr. Chairman. I’m shocked.

MISSISSAUGAWATCH whispers into camera, General Committee June 26, 2013

I’m not.

Councillor Jim Tovey (Chair), General Committee June 26, 2013

Anyone have a message to follow?

Councillor Nando Iannicca, General Committee June 26, 2013

My God!

[mocking] “But we don’t own it.”

Former Liberal MP/Councillor Bonnie Crombie, General Committee June 26, 2013

Tell us how you really feel.

Councillor Nando Iannicca mocking, General Committee June 26, 2013

“We don’t own it.”

“We don’t own it.”

Councillor Jim Tovey (Chair), General Committee June 26, 2013

Yeah.

Councillor Nando Iannicca mocking, General Committee June 26, 2013

We’ll have to talk to the company I guess so— oh!

Councillor Jim Tovey (Chair), General Committee June 26, 2013

Mmhm. Just a clarification. The MPP and the Finance Minister are not the same person actually. It’s Dipika Damerla’s riding, actually is where Loreland is.

Councillor Nando Iannicca, General Committee June 26, 2013

Thank you for the clarification.

Councillor Jim Tovey (Chair), General Committee June 26, 2013

The other clarification is that the citizens in 2007 took Ontario Power Authority’s own report to them which clearly stated that they could have converted Nanticoke to 2,0oo megawatts and they didn’t have to build any of these power plants…

[VIDEO TRANSCRIPT EXCERPT ENDS]

Reminder that this is an excerpt of the video and not a video transcript in its entirety. Next, any errors are mine and I’d appreciate being advised so I can fix them.

Last. While I share Councillor Iannicca’s disgust at the McGuinty-Wynne Liberal government’s gas-plant-gate, I don’t entirely agree with his urging that the gas plant be demolished and a park put in its place, “To cover up the shame”.

What with email-gate, there’s been enough Liberal cover-up, thank you very much. Yes, a park is a worthy goal but at least part of the gas plant should remain complete with plaque with words something to the effect:

“This site commemorates a horrible chapter in the history of this Province that we are doomed to repeat again and again, for no other reason than Ontarians see themselves as taxpayers instead of citizens.”

Mississauga Councillor BLASTS "shameful" McGuinty-Wynne Liberals

 

 

 

 

 

 

 

Post Linx
Permalink | | Print This Article

Mississauga Councillor Nando Iannicca on: Municipal Election Campaign Contribution Rebate Program

June 26th, 2013  

This letter from Mississauga Councillor Nando Iannicca to his Ward 7 constituents has been reproduced here with his kind permission.

Regarding the Municipal Election Campaign Contribution Rebate Program he writes:

Dear Ward 7 Ratepayers,

I bring to your attention a report on a Municipal Election Campaign Contribution Rebate Program that will be going to the Governance Committee of the City of Mississauga on Wednesday, June 12, 2013.  Once this committee has dealt with the matter their final recommendation will be coming to a future Council meeting for ratification.

First and foremost, I bring the enclosed information to your attention because I fear you otherwise may not be aware of what is being proposed.  Secondly, as both a Municipal Councillor whose first duty is to Taxpayers and not myself, and also as a private citizen, I have grave concerns at what may come to pass.  A new policy is suggested that would see all Mississauga taxpayers rebate 50% of all political campaign contributions private individuals or corporations make to a candidate’s election campaign for any contribution between $100.00 and up to $750.00.

The full report can be obtained online at
http://www7.mississauga.ca/documents/agendas/committees/governance/06_12_2013_Governance_Committee_Agenda.pdf.  I take this opportunity to highlight some of the comments directly from the report.

Through detailing the procedures and writing the draft implementing By-law, the Elections Office has identified the following concerns that relate to the Rebate Program:

Given the uncertainty of the outcomes which will be achieved from the implementation of a Rebate Program, it is recommended that the Program be undertaken as a pilot program for the 2014 Municipal Election, and that Election staff review and report back to Governance Committee following the conclusion of the 2014 Rebate Program.

Financial Impact:  The anticipated costs associated with the Rebate Program are as follows:

For my part, I am strongly opposed to the new program for the following reasons:

All told, as a politician, candidate, and taxpayer I have always taken great comfort in the fact that I play by the rules given to me, and any contributions received, in addition to the money my spouse and I put into my campaign, is in no way subsidized by any other taxpayer.

It is my strong belief that this is the system that should remain, and that you should be made aware of what is being contemplated.

Kindest personal regards,

[SIGNATURE]

Nando Iannicca
Councillor, Ward 7

Post Linx
Permalink | | Print This Article

ELIAS HAZINEH v. HAZEL McCALLION REASONS FOR JUDGMENT OF MR. JUSTICE JOHN R. SPROAT (released June 14, 2013)

June 22nd, 2013  

What follows is Justice John R. Sproat’s “Hazineh vs McCallion” decision scanned from the Hazineh v McCallion – Reasons for Judgment_June 14, 2013 (PDF) file. We’ve done our best to ensure that our scan matches Justice Sproat’s original text. Any errors are ours and we’d appreciate being advised as well.

                                               CITATION: HAZINEH v. McCALLION, 2013 ONSC 2164
                                                                 COURT FILE NO.: CV-12-1130-OO 
                                                                               DATE: 2013-06-14

                                                     ONTARIO 

                                            SUPERIOR COURT OF JUSTICE

BETWEEN:                                                )
                                                         )
ELIAS HAZINEH                                           )  Thomas A. Richardson and Monique 
                                                         )  Atherton, for the Applicant 
                                                         ) 
                                                         ) 
                                          Applicant     ) 
                                                         ) 
                                                         ) 
                                                         ) 
- and -                                                 )
                                                         ) 
HAZEL McCALLION                                         )  Elizabeth J. Mclntyre and Freya J. 
                                                         )  Kristjanson, for the Respondent 
                                                         ) 
                                                         )
                                            Respondent  ) 
                                                         ) 
                                                         ) HEARD: April 3, 8-12, 15-19, 2013

                                      REASONS FOR JUDGMENT

SPROAT J.

Table of Contents 
INTRODUCTION ............................................................................. 1 
The Issues ............................................................................... 1 
The Witnesses ............................................................................ 3 
The Municipal Conflict of Interest Act ..................................................... 5 
The Mississauga Judicial Inquiry .......................................................... 6

OVERVIEW OF THE FACTS ..................................................................... 7 

DID MAYOR MCCALLION HAVE A DEEMED FINANCIAL INTEREST IN WCD? ................................ 15
The Law ................................................................................. 15 
The Financial Interest of Peter McCallion in WCD ........................................... 16 
What did Mayor McCallion know about Peter’s Interest in WCD? ................................ 18 
Analysis and Conclusion .................................................................. 22 

COULD WCD QUALIFY UNDER THE TRANSITIONAL PROVISIONS? ....................................... 23 
Introduction ............................................................................. 23 
The Evidence ............................................................................. 23 
Analysis and Conclusion ................................................................... 27 

WAS MAYOR MCCALLION’S DEEMED FINANCIAL INTEREST AN INTEREST IN COMMON WITH ELECTORS GENERALLY? .. 31 
The Law ................................................................................... 31 
The Evidence .............................................................................. 33 
Analysis and Conclusion .................................................................... 34 

WAS MAYOR MCCALLlON’S DEEMED FINANCIAL INTEREST REMOTE AND INSIGNIFICANT? ..................... 36 
The Law ................................................................................... 36 
The Evidence .............................................................................. 37 
Analysis and Conclusion .................................................................... 39

                                                        -2-


WAS ANY CONTRAVENTION DUE TO INADVERTENCE OR BY REASON OF AN ERROR IN JUDGMENT? ................ 45 
The Law ................................................................................... 45 
The Evidence .............................................................................. 46 
Analysis and Conclusion .................................................................... 47 

DID MR. HAZINEH COMMENCE THE APPLICATION IN TIME? ............................................ 48 
The Law ................................................................................... 48 
The Evidence .............................................................................. 48 
Analysis and Conclusion .................................................................... 50 

SHOULD THERE BE AN ADVERSE INFERENCE AGAINST MAYOR MCCALLION? ................................. 52 

CONCLUSION ................................................................................. 53

INTRODUCTION

The Issues
[1] This is an application brought by Elias Hazineh (“Mr. Hazineh”) seeking to
have Hazel McCallion (“Mayor McCallion”), the Mayor of the City of Mississauga
(“the City”), removed from office for violating the Municipal Conflict of lnterest Act
(“the MCIA”).

[2] in brief, Mr. Hazineh alleges that:

(a) Mayor McCalli0n’s son Peter McCallion (“Peter”) incorporated and
was an owner of World Class Developments Inc. (“WCD”). WCD
agreed to purchase land for the purpose of constructing a hotel,
conference centre and condominium towers.

(b) Mayor McCallion knew Peter had a financial interest in WCD. As
such, the MCIA deems her to have the same financial interest as
Peter for conflict purposes.

(c) Mayor McCallion cast a number of votes at Peel Regional Council
(“Regional Council”) in September-October, 2007 (“the Votes“),
related to increased development charges. As enacted, the by-law
contained provisions (“the Transitional Provisions”) by which
developers who met certain requirements, including the filing of a


-2-

 

complete site plan application by October 7, 2007, continued to be
eligible to pay the lower rate.

(d) WCD was eligible to qualify under the Transitional Provisions. As
such, WCD and Mayor McCallion had a financial interest in the
Votes.

(e) It was not until reading an October 11, 2011 article by municipal
lawyer Clay Connor that Mr. Hazineh learned of Mayor McCallion’s
conflict of interest at Regional Council. As required by the MCIA he
then commenced a court application within six weeks of learning of
the conflict.

[3]  The issues are as follows:

(a) What was Peter’s interest in WCD?

(b) What did Mayor McCallion know about Peter’s interest in WCD?

(c) Had WCD filed a complete site plan application prior to October 7,
2007, such that it was eligible to qualify under the Transitional
Provisions?

-3-

 

(d) if WCD was eligible, and so had a financial interest in the
Transitional Provisions, do any of the following MCIA exemptions
apply?:

(i) Was Mayor McCallion’s deemed financial interest an interest
in common with electors generally?; or

(ii) Was Mayor McCalli0n‘s deemed financial interest remote and
insignificant such that it cannot reasonably be regarded as
likely to have influenced her?; or

(iii) Were the Transitional Provisions a benefit offered on terms
common to other persons?

(e) If Mayor McCallion contravened the MCIA, was the contravention
committed through inadvertence or an error in judgment such that
she should not be removed from office?

(f) Did Mr. Hazineh commence the application in time?

The Witnesses

[4] The witnesses and their affiliations are as follows:

Applicant

Elias Hazineh  Applicant
Carolyn Parrish  Supporter and friend

Respondent

Hazel McCallion  Mayor

The City

Edward Sajecki                Commissioner of Planning and Building
Marilyn Ball                     Director of Development and Design
Angela Dietrich               Manager, City Wide Policy Planning
Bentley Phillips               Development Planner

Region of Peel

Robert Elliott                  Manager of Development Financing

WCD

Leo Couprie                    Lender, Trustee of shares
Scott Walker                   Planner, N. Barry Lyon Consultants

Other

Marolyn Morrison         Mayor of Caledon
Susan Fennel                  Mayor of Brampton
Ken Lusk                         Representative of land owner


-5-

 

The Municipal Conflict of interest Act

[5] Section 3 provides that if the child of a member of council has a financial
interest (the MCIA refers to “pecuniary interest”, however, I will use the more
familiar expression “financial interest”) that is known to the member, the member
is deemed to have the same financial interest as the child.

[6] Section 5 provides that if a member has a financial interest in a matter that
is considered at council the member shall disclose the interest, not take part in
the discussion or vote on the matter and not attempt to influence the voting.

[7] Section 4 provides that s. 5 does not apply to a financial interest in any
matter that the member may have:

(a) by reason of the member being entitled to receive on terms common
to other persons any benefit offered by the municipality (s.4(b));

(b) by reason of the member having a financial interest that is an interest
in common with electors generally (s.4(j)); and

(c) by reason only of an interest of the member that is so remote or
insignificant that it cannot reasonably be regarded as likely to
influence the member (s.4 (k)).

-6-

 

[8] Section 10 provides that if a judge determines that a member has
contravened s. 5, the judge shall order that the member be removed from office
unless the judge finds that the contravention was committed through
inadvertence or by reason of an error in judgment.

[9] Section 9 provides that an elector may apply to a judge for a determination
of whether s. 5 has been contravened within six weeks after it comes to the
knowledge of the elector that the member may have contravened s. 5. Any
application must, however, be brought within six years of when the alleged
contravention occurred.

The Mississauga Judicial lnquiry

[10] On November 11, 2009, City Council passed a resolution requesting a
judicial inquiry (“the Judicial lnquiry”) into matters including whether Mayor
McCallion had a conflict of interest in matters related to WCD and Peter. The
resolution requesting the Judicial lnquiry did not refer to any issues related to
Regional development charges.

[11] The Public Inquiries Act, S.O. 2009, ch. 33 sch. 6 provides that no
answer given by a witness, such as Mayor McCallion, can be used against her in
a subsequent hearing. The transcript of the evidence of other Judicial lnquiry
witnesses is also not admissible as it is hearsay.


-7-

 

OVERVIEW OF THE FACTS

[12] There is undoubtedly much that I do not know about this saga. None of
the WCD decision makers provided evidence although they could have been
compelled to do so. It remains that I must decide the case based upon the
evidence before me.

[13] The parties filed over 5,000 pages of affidavits and documents and 2,500
pages of transcript of out of court examinations and cross-examinations. Mr.
Hazineh and Mayor McCallion also testified in court.

[14] l first provide an overview of the essential facts as l find them. Most are
not in dispute. Without such an overview it would be difficult to comprehend the
discussion of the individual legal issues that follows.

[15] Mayor McCallion has served as Mayor for 34 years. As of 2005, she had
three significant outstanding projects she wished to accomplish, one of them
being the building of a first class hotel adjacent to the City’s Living Arts Centre to
accommodate conferences, tourists and business travellers.

[16] On February 22, 2005, Peter incorporated WCD. According to Mayor
McCallion, in 2005 Peter told her that he was the real estate agent for WCD
which was interested in developing a hotel and convention centre adjacent to the


-8-

 

Living Arts Centre. The lands were owned by OMERS and the Alberta Pension
Fund. l will simply refer to the owner as OMERS.

[17] In March 2005, WCD offered to purchase the OMERS lands. Peter did
not have the funds to pay a substantial deposit. There is little evidence as to
what resulted from this initial offer.

[18] In 2006, Peter approached Leo Couprie (“Couprie”), a business man that
he and Mayor McCallion had met on a trade mission trip to China. By August,
2006, Couprie agreed to lend WCD $750,000 for the purpose of making a
deposit on the purchase.

[19] Couprie gave evidence that Peter brought in Murray Cook (“Cook”), a
businessman and McCallion family friend as a 20 per cent shareholder in WCD.
Peter authorized Cook to negotiate with OMERS.

[20] Mayor McCallion intervened and pressured OMERS to sell the land to
WCD. Mayor McCallion’s evidence is that she did so because this was an
essential first step to realize her objective of a first class hotel and conference
centre. Mayor McCallion’s evidence, which was not challenged, was that she
recommended to OMERS that it stipulate that hotel construction must precede
any condominium development.


-9-

 

[21] By agreement dated January 29, 2007 Couprie agreed to lend WCD
$750,000. WCD agreed to repay Couprie $750,000 and pay an additional
$750,000 fee to him if the land purchase was completed. Peter guaranteed the
payments to Couprie. It was further agreed that the WCD shares would be
registered in Couprie‘s name although a Declaration of Trust was signed in which
Couprie promised Peter that he would hold 80 per cent of the shares of WCD for
Peter as “the beneficiary”.

[22] WCD entered into an Agreement of Purchase and Sale (“APS”) dated
January 31, 2007 to purchase the OMERS lands. The purchase price was
$14,492,500. Peter authorized Cook to sign the agreement on behalf of WCD.

[23] On February 28, 2007, WCD, Couprie and Cook entered into a
Shareholders Agreement that provided that even though Couprie held 80 per
cent of the WCD shares, and Cook 20 per cent, they would jointly make
decisions as if each held 50 per cent of the shares. Couprie’s evidence,
however, is that he had little interest in the affairs of WCD. Couprie had no
expertise in land development. He deferred to Peter in relation to all significant
decisions affecting WCD. This makes sense as Couprie’s only economic interest
was in either doubling his money if the APS was completed (meaning the
development was proceeding) or getting a return of his $750,000 deposit if it was
not completed.


-10-

 

[24] Mayor McCallion’s evidence was that at all material times she understood
that Peter‘s only interest was as a real estate agent. The evidence is
overwhelming and, as later explained, l find as a fact that Peter was an owner of
WCD.

[25] On July 31, 2007, WCD filed a “Master Site Plan Application” that
included a hotel, conference centre and eight high-rise condominium buildings
and paid a $50,000 fee being 10 per cent of the ordinary site plan application fee.

[26] Couprie gave evidence that there was a dispute between Peter and Cook
that led to Peter replacing Cook with Tony DeCicco (“DeCicco”). DeCicco was a
developer known to Peter and Mayor McCallion. By agreement dated August 1,
2007 between Couprie and Landplex lnc. (DeCicco’s company), Couprie agreed
that he held 80 per cent of the shares in WCD in trust for Landplex. it was
always recognized that for the development to proceed WCD would have to
secure a major developer-investor and a hotel operator.

[27] Municipalities have the power to impose development charges to assist in
paying for the increased infrastructure necessitated by development. The
philosophy of the Mayor, and the Region of Peel, (“the Region”), was that “growth
should pay for growth”.


-11-

 

[28] The Region initiated a periodic review of its development charges in
2006. On August 13, 2007, Regional staff recommended an 85 per cent
increase in development charges with a transition period whereby the increased
charges would not be payable by developers who had:

(a) submitted a site plan application by September 13, 2007;

(b) submitted a building permit application by February 1, 2008; and

(c) obtained a building permit by April 1, 2008.

[29] At the General Committee Meeting of The Regional Council on
September 6, 2007, a motion was made to adopt the staff recommendation.
Caledon Mayor Morrison’s evidence, which I accept, was that she told Mayor
McCallion that Caledon would benefit from a one month extension of the time to
obtain a building permit. Mayor McCallion offered to move a motion as a favour
to Mayor Morrison given the belief that, as the senior Mayor in the Region, Mayor
McCallion’s views would be given greater weight. The motion, which was
adopted, extended the time to obtain a building permit to May 1, 2008.

[30] Brampton had a particular concern that the imposition of increased
development charges would impede its downtown development initiatives.
Brampton Council passed a resolution on September 12, 2007, asking the
Region to amend the transition provisions to allow developers in downtown


-12-

 

Brampton an additional 18 months, to November 1, 2009, to obtain a building
permit.

[31] On September 13, 2007, Mayor Fennell of Brampton presented a motion
at Regional Council based on the wording of the Brampton resolution the
previous day. Mayor Fennell’s evidence was that the Regional clerk
“regionalized” the wording of the Brampton specific resolution. As presented at
Regional Council the motion provided that developers, in any area designated by
an area municipality (Mississauga, Brampton or Caledon), would have an 18
month extension of the transition period. Mayor McCallion seconded this motion
which passed.

[32] There is no evidence that Mayor McCallion played any role in the
decision to “regionalize” the language of the motion presented at the Regional
Council, or that suggests to me she viewed the 18 month extension proposed by
Mayor Fennell as a fortuitous opportunity to help WCD. l find as a fact that
Mayor McCallion seconded this motion as a matter of routine and to be
supportive of Mayor Fennell.

[33] Regional staff were quite surprised by this motion and requested an
opportunity to report back on the cost implications. On September 14, 2007, the
Chief Financial Officer of the Region wrote to the senior planning officials of the


-13-

 

three Regional municipalities indicating he believed the intention of Regional
Council was to extend the transition period for “identified areas of intensification”.
He also requested a map showing areas of intensification and a list of pending
site plan applications in those areas.

[34] By letter dated September 19, 2007, Edward Sajecki (“Sajecki”), the
Commissioner of Planning for the City, listed the WCD project as one of eighteen
projects within the area the City had previously identified as its Urban Growth
Centre.

[35] l do not construe the Sajecki letter as purporting to bind the City as to the
area of intensification. Sajecki was simply advising of the projects in an area the
City had already determined to be an area of intensification. If the Regional by~
law had passed in that form, it would still have been up to the City Council to
identify areas of intensification within the meaning of the by-law.

[36] On September 24, 2007, Marilyn Ball (“Ball”) the Director, Development
and Design of the City emailed staff at the Region indicating that WCD had only
filed a “Master Site Plan” and not a standard site plan. She advised that the
Master Site Plan “will not be sufficient to satisfy the condition for site plan
approval to obtain a building permit for the hotel or any other buildings”.


-14-

 

[37] At the September 27, 2007, Regional General Committee meeting staff
presented an array of concerns about the extended transition period including
that it would cost $25-$30 million and be contrary to the Regional policy that
“growth should pay for growth.”

[38] On October 4, 2007, Regional Council passed a by-law (“the Transitional
Provisions”) that adopted the transition period originally recommended by staff,
plus the one month extension moved by Mayor McCallion. (Regional Council did
enact an exception for Brampton in accordance with the City of Brampton
resolution of September 12, 2007.) The Transitional Provisions applied to
developments for which:

(a) “an application for site plan approval that is complete” is made by
October 7, 2007;

(b) “an application that is complete” for a building permit is made by
February 1, 2008; and

(c) a building permit is issued by May 1, 2008.

[39] ln November 2007, WCD decided to accelerate its efforts in order to
enable it to qualify under the Transitional Provisions. WCD took the position that
its Master Site Plan filed July 31, 2007, met the first Transitional Provisions
requirement, that being a complete application for site plan approval by October
7, 2007.

-15-

[40] WCD worked feverishly toward addressing various planning issues that
needed to be resolved before building permits could issue. WCD met the second
requirement by filing building permit applications for phase one of its
development which included the hotel and conference centre. WCD went to the
extent of requesting that a special meeting of council be convened on April 30,
2008, in the hope it would meet the May 1, 2008, deadline for issuance of
building permits. WCD could not, however, satisfy all of the City’s requirements
and withdrew the request for a special meeting.

[41] WCD effectively strung the City along to the last minute and circumvented
the by-law requirement that site plan applications not be processed prior to
payment of the application fee. WCD never paid the complete site plan
application fee of $440,000 or even a lesser fee related to the phase one
development. WCD never found a major developer-investor or hotel operator.
The project did not proceed. OMERS remained the owner of the land.

[42] l now turn to the issues that must be decided and make further findings of
fact on contentious matters.

DID MAYOR MCCALLION HAVE A DEEMED FINANCIAL INTEREST IN
WCD?

The Law

-16-

[43] Section 3 of the MCIA provides that if the child of a member has a
financial interest, known to the member, the member is deemed to have the
same financial interest as the child.

The Financial Interest of Peter McCallion in WCD

[44] in support of her position that Peter was not an owner, Mayor McCallion
placed considerable reliance on a series of answers given by Couprie in cross-
examination. Couprie agreed that, as of September-October, 2007, Peter was
not a shareholder, director or officer of WCD and that he had no other financial
relationship with WCD. Mayor McCallion made further reference to Couprie’s
evidence that Peter’s only financial interest was contingent, being the possibility
that the developer might agree to retain Peter as the listing agent for the
condominiums. On that basis, Mayor McCallion submitted that Peter was not an
owner and any financial interest was remote and insignificant.

[45] Couprie is a businessman not a lawyer. His legal conclusion that Peter
had no ownership interest in WCD does not follow from the evidence he gave.
As Couprie himself described, l would control the shares and wouldn’t give
them back to Peter until such time l got the money [$750,000] back and l
wouldn’t give them to anyone else”. In other words, they were Peter’s shares

-17-

held by Couprie as security. On that basis, alone Peter had a beneficial
ownership interest in WCD as of September-October, 2007.

[46] The evidence is overwhelming, and l find, that Peter was an owner of
WCD:

(a) Peter caused WCD to be incorporated.

(b) Peter recruited Couprie to fund the required $750,000 deposit to
purchase the OMERS lands.

(c) Peter and Couprie entered into the January 29, 2007, Declaration of
Trust in which Couprie agreed that he held 80 per cent of the shares
of WCD in trust for his “beneficiary” Peter.

(d) Peter recruited Cook to play a leading role in WCD, including
negotiating and signing the APS.

(e) While the February 28, 2007, agreement between Couprie and Cook
provided that they would jointly make all decisions, Couprie’s
evidence was that Peter decided “who was staying and going” and
brought in DeCicco to replace Cook.

(f) Peter deposited over $100,000 into the WCD bank account to pay
WCD consultants and withdrew certain amounts for personal

-18-

purposes. Couprie took no objection to this because WCD funds
were Peter’s money.

[47] After the APS was signed, the hunt was on for a major developer who
could fund and/or finance a development in the hundreds of millions of dollars.
The developer would have to do a deal with WCD. It is contrary to common
sense and experience to think that the deal with the developer would not reward
Peter for his equity in WCD. Whether this was a lump sum payment for his WCD
shares, a consultancy agreement and/or as a real estate agent for condominium
sales is immaterial. lf this development went ahead, Peter was going to have a
big pay day.

What did Mayor McCallion know about Peter’s Interest in WCD?

[48] Mayor McCallion‘s evidence was that, at the time of the Votes, she
understood that Peter’s only interest in WCD was as a real estate agent. In
deciding what Mayor McCallion knew I will consider:

(a) her relationship with Peter and long-standing interest in the
development of a hotel and conference centre;

(b) that in January 2007, she witnessed documents signed by Peter and
Couprie which indicated clearly that Peter was an owner of WCD;
and

-19-

(c) that within one month after the Votes, she was engaged in the
internal affairs of WCD to the extent that documents to do with the
shareholdings of Cook and DeCicco in WCD were faxed to her
home, and DeCicco solicited her advice and assistance to resolve
issues he had with Cook.

[49] Mayor McCallion was enthusiastic about attracting a first-class hotel to
the City centre as this was a long time goal. She acknowledges intervening to
encourage OMERS to sign the APS with WCD. Mayor McCallion said she had
regular contact with OMERS representatives. The signing would inevitably have
been raised at such meetings. Mayor McCallion must have known of the APS by
February-March 2007.

[50] This was not only a project near and dear to Mayor McCallion’s heart. lt
was also clearly a transaction that would generate a large commission for the
real estate agent. As a matter of common sense and experience, it would be
natural for Mayor McCallion to inquire about WCD. Mayor McCallion had
frequent contact with Peter. He often drove her to events. Given their close
relationship, it would be natural for Peter to want to tell her about his pivotal role
at WCD.

-20-

[51] Mayor McCallion, however, denies that she ever discussed the status-
progress of the WCD project with Peter. Couprie’s evidence was that Peter did
not want his mother to know too much about the deal until it got closer to fruition.

[52] l appreciate that how people usually act can only take the analysis so far.
Each family dynamic is different. l, therefore, turn to documentary evidence and
admitted facts.

[53] Mayor McCallion admits that she witnessed the Peter~Couprie Loan
Agreement and the Declaration of Trust at a restaurant in late January 2007.
She said the restaurant was dimly lit and she witnessed the signatures without
reading any part of the documents.

[54] The slightest glance at the documents would have revealed that Peter
had an interest in WCD beyond that of a real estate agent. On the “Loan
Agreement” her signature ends less than two inches from the description of Peter
as “Guarantor” and WCD as “Borrower”. On the “Declaration of Trust” her
signature ends less than two inches from the description of Couprie as “trustee”
and Peter as “beneficiary”.

[55] Couprie’s evidence was that the documents were passed across the table
and Mayor McCallion did not read them before signing. Obviously only Mayor
McCallion can say what she did or did not notice when signing. If, however,


-21-

Peter was concealing his ownership interest in WCD, it is highly unlikely that
Peter would allow Couprie to pass these documents to her.

[56] Next l turn to what transpired only one month after the Votes. l regard
this as relevant because Mayor McCallion’s evidence was that, both before and
after the Votes, she had no specific knowledge of the ownership or internal
arrangements at WCD. This is, however, contradicted by the following evidence.

[57] An unsigned Shareholders Resolution and Transfer Agreement between
Cook, Couprie and WCD was faxed by a lawyer representing DeCicco to Mayor
McCallion at her home on October 26, 2007. This agreement is two pages long.
A cursory review reveals that it provides that, in return for $28,000 and
reimbursement for all reasonable consulting fees of Lyon Consulting incurred by
WCD, Cook is to resign as a director and officer of WCD and transfer his WCD
shares to Couprie. Reference is also made to a “Put and Call Agreement”.

[58] Couprie gave evidence that he attended a meeting at Mayor McCallion’s
home because Peter wanted him to give Mayor McCallion his opinion regarding
the Cook-DeCicco dispute.

[59] DeCicco left Mayor McCallion three voicemail messages on November 5,
2007, as follows:


-22-

 

(a) 8:52 A.M. — indicating that he had spoken with Barry [Lyon] at length
about his outstanding accounts and “when Peter comes back we’ll
look at the budget and move fon/vard [ . . . ] thanks for your help”.

(b) 9:03 A.M. — “Were you able to or have you considered getting Murray
[Cook] to sign the agreement terminating the call. The sooner we get
it the better off we are”.

(c) 11:36 A.M. — “I just wanted to keep you updated on this . . followed
by reference to Murray [Cook] and outstanding amounts, budgets and
bills.

[60] Mayor McCallion testified that she does not recall reading the agreement
faxed to her home. She does not recall if she ever responded to DeCicco’s
voicemail messages. The content of the voicemail messages, however, makes
clear that Mayor McCallion was in the loop. DeCicco thanked her for her help
and referred to looking at the budget when Peter gets back. DeCicco spoke of
terminating the “call” which obviously references the “Put and Call” referred to in
the agreement faxed to Mayor McCallion.

Analysis and Conclusion

[61] Taking into account the totality of the evidence including:

(a) The close relationship between Mayor McCl|lion and Peter and her
interest in what he and WCD were doing.

(b) The fact that Peter was prepared to have her witness documents
which clearly disclosed he was an owner of WCD.

-23-

(c) That she witnessed documents which indicated clearly that Peter
was an owner of WCD.

(d) That within one month of the Votes, Mayor McCallion was provided
with draft agreements and effectively asked to inten/ene in a WCD
shareholder dispute.

l find as a fact that, at the time of the Votes, Mayor McCallion knew that Peter
had an ownership interest in WCD. As such, according to s. 3 of the MCIA,
Mayor McCallion had a deemed financial interest in WCD.

COULD WCD QUALIFY UNDER THE TRANSITIONAL PROVISIONS?

Introduction

[62] To qualify under the Transitional Provisions “an application for site plan
approval that is complete” had to have been filed by October 7, 2007. Mayor
McCallion submitted that the Master Site Plan application was not “a site plan
application that is complete” and so WCD was not eligible under the Transitional
Provisions. If correct, then WCD had no financial interest in the by-law and so
Mayor McCallion cannot have contravened the MCIA.

The Evidence

[63] Ball’s evidence was that a Master Site Plan is sometimes used for large
developments, to be built over many years, to identify the locations of buildings,

-24-

access points and the general attributes of the site. A general layout for the
entire property is necessary before the planning department will consider a site
plan for any one building. A site plan application is then required before a
building permit can be obtained.

[64] A City by-law governed the fees payable for various applications. The fee
for a site plan application for the entire WCD development was initially estimated
by the City to be $500,000. The by-law further provided that no site plan
application shall be processed until the fee is paid. Master Site Plans are
sufficiently rare that the by-law, which appears to be directed to providing a
comprehensive list of fees for the processing of applications under the Planning
Act R.S.O. 1990, ch. P. 13 (“Planning Act”), does not even refer to Master Site
Plans.

[65] WCD retained N. Barry Lyon Consultants (“Lyon Consulting”). Scott
Walker (“Walker”) of Lyon Consulting was the WCD project manager. WCD and
Lyon Consulting engaged other consultants to assist.

[66] On July 12, 2007, Ball emailed Carol Munroe (“Munroe”), a planner
working for WCD, advising that the City would charge 10 per cent of what would
be the total site plan application fee to review the Master Site Plan.

-25-

[67] On July 24, 2007, Bentley Phillips (“Phillips”), the City planner handling
the WCD file, emailed Munroe explaining the City‘s position that the Master Site
Plan was not itself a site plan under s. 41 of the Planning Act because its
purpose was to serve as the basis for future site plan applications. Phillips made
a note of a conversation the same day in which Walker indicated that legal
counsel for WCD understood that other GTA municipalities had approved Master
Site Plans under s. 41 of the Planning Act subject to an agreement requiring
detailed site plan applications prior to any building permit applications.

[68] On July 25, 2007, Munroe confirmed that no building permits would be
sought based on the Master Site Plan. Further, on July 25, 2007, Phillips
emailed Munroe confirming the position of the City that a Master Site Plan would
not be considered for site plan approval under s. 41 of the Planning Act.

[69] On July 31, 2007, WCD filed a Master Site Plan Application. A place for
the City planner to list the “general requirements” of the plan and the “building
elevations” was not completed. Phillips’ evidence was that it was given a site
plan number because the City had no numbering system for a Master Site Plan.

[70] The City kept a running list of pending site plan applications. WCD did
not appear on that list prior to September 19, 2007. The list submitted by Sajecki
to the Region with his letter of September 19, 2007 listed WCD, but, unlike all

-26-

other entries, the floor area was not specified. This caused Robert Elliott
(“Elliott”) the Manager of Development Financing of the Region to inquire about
the WCD project. Ball advised Elliot on September 24, 2007, that WCD had only
filed a Master Site Plan, and that was not sufficient to obtain a building permit.
Effectively Ball was communicating that WCD could not qualify under the

Transitional Provisions.

[71] Walker‘s evidence was that, when Cook was leading the project, WCD
was not attempting to qualify under the Transitional Provisions. Cook thought
WCD could not reasonably meet the requirements. A financial analysis indicated
that the project was viable even with the increased development charges.
Further, given that it would be built over many years, large parts of the project
would be subject to increased development charges regardless. When DeCicco
took over he thought differently, and the push was on to have at least pan of the
project qualify under the Transitional Provisions.

[72] WCD and its consultants held a meeting on November 21, 2007. The
minutes record that its goal was now to submit building permit applications for the
hotel site by January 31, 2008. WCD was going to try to use the “existing site
plan application” (being the Master Site Plan application) to attempt to qualify
under the Transitional Provisions.

-27-

[73] lt was not until a meeting on January 11, 2008, that WCD advised City
staff that it was seeking to qualify under the Transitional Provisions. This change
in position on the part of WCD led to a Januaiy 25, 2008, legal opinion from the
Assistant City Solicitor which concluded that the July 31, 2007, Master Site Plan
application was a complete application for site plan approval under both s. 41 of
the Planning Act and the Transitional Provisions. Ball’s evidence was that she
did not agree with “the way the opinion was set out” because, in fact, it was only
by January 2008, that WCD had submitted the detail required in a site plan
application.

Analysis and Conclusion

[74] l have had the benefit of reviewing extensive document briefs,
approximately 600 pages of transcript evidence from City planning officials and
hearing extensive legal submissions. l have relatively little information as to the
factual basis for the opinion of the Assistant City Solicitor. ln any event, l am
obliged to reach my own conclusion.

[75] For the reasons that follow, l find that as of October 7, 2007, WCD had
not filed a “site plan application that is complete” within the meaning of the
Transitional Provisions.

-28-

[76] Neither the Planning Act, nor the by~law incorporating the Transitional
Provisions, define the terms “site plan” or “site plan application that is complete”.

[77] The City distinguished between “site plan” applications that require
payment of a fixed fee before being processed and “Master Site Plan”
applications that can be filed on major projects based upon a fee to be
negotiated. The two types of applications are radically different in terms of the
level of detail. The City charged, and WCD paid, only 10 per cent of the site plan
application fee because the work required of City staff to process WCD’s Master
Site Plan application would be roughly 10 per cent of that required to process a
site plan application.

[78] At issue is the proper interpretation of the Transitional Provisions which
require “an application for site plan approval that is complete”. Mississauga is
the largest of the three municipalities in the Region. Mississauga recognized a
clear distinction between site plan applications and Master Site Plan
Applications. (There is no evidence as to Brampton and Caledon). Just prior to
the vote on the Transitional Provisions, the City had advised the Region that
WCD had filed a “Master Site Plan”. The distinction between a “Master Site
Plan” and a site plan was, therefore, evident to the Region. l, therefore, conclude
that if the intent of the Transitional Provisions was to allow a “Master Site Plan” to
qualify that would have been specified. Put differently it defies common sense, in

-29-

the context of the Transitional Provisions, to include in the definition of site plan
application a conceptual plan containing roughly 10 per cent of the detail of a site
plan application.

Further, and in any event, the Transitional Provisions require an application for
approval “that is complete”. Those words can and should be given meaning. The
“City Application for Site Plan Approval” form lists what the application is to
“consist of’. One listed requirement is a checklist completed by the City planner
at the time of submission. (Part of the process is that a City planner reviews the
application at the time of submission). Counsel for Mr. Hazineh agreed that this
checklist had to be completed to constitute a “complete” application.

[79] On the WCD application, all of the checklist boxes under the headings
“general requirements” and “building elevations” were left blank. Phillips, the City
planner, simply noted this was a “Master Site Plan”. The only three boxes ticked
off were under the heading “Floor Plans Note”. Counsel for Mr. Hazineh
submitted that this was sufficient to constitute this as a “complete” application. l
do not agree. When Phillips made the notation “Master Site Plan” and wrote
“okay” beside the unticked boxes, I conclude he did so to indicate that the form
was not complete but that was “okay” because it was a Master Site Plan
application. Phillips‘ evidence was that he would have ticked off the appropriate

-30-

boxes if he regarded this as a site plan application. If this was a site plan
application, WCD would be required to pay the full $440,000 fee.

[80] Counsel for Mr. Hazineh made the point that the APS contained a
provision requiring that WCD file a “full and complete” site plan application by
July 31, 2007. What constituted a “full and complete” site plan application within
the meaning of the APS might well be different from a “site plan application that
is complete” within the meaning of the Transitional Provisions. ln any event
OMERS had no obligation to terminate the APS due to non-compliance with a
condition. The fact that OMERS proceeded with the transaction, following the
filing of a Master Site Plan, is of little or no significance in interpreting the
Transitional Provisions.

[81] The fact that the City allowed WCD to use a site plan application form,
and assigned a site plan application number, is relatively weak evidence that the
Master Site Plan application is a site plan application within the meaning of the
Transitional Provisions. As Phillips explained, there simply was no form for a
Master Site Plan application.

[82] While that is sufficient to reach my conclusion, l add the following. Mayor
McCallion testified, and common sense supports, that the rationale for a
transitional period is that at some point a developer is so far along in the process

-31-

that it would be unfair to impose the higher development charges. As the staff
presentation to Regional Council on September 27, 2007 stated: “The purpose of
a transition is to recognize applications that are imminently proceeding to
approvals stage and thus have difficulty in absorbing notable rate increases.”
This underlying rationale has little application to WCD which, as of October 7,
2007, had only filed a conceptual Master Site Plan and paid 10 per cent of the
site plan application fee.

[83] I, therefore, conclude that WCD could not qualify under the Transitional
Provisions since it had not filed a “site plan application that was complete” by
October 7, 2007. As such, WCD had no financial interest in the development
charges by-law adopted by the Region. On that basis alone Mr. Hazineh’s
application must be dismissed.

[84] ln case l am in error in reaching that conclusion, l will consider whether
certain exceptions and defences in the MCIA are applicable.

WAS MAYOR MCCALLlON’S DEEMED FINANCIAL INTEREST AN INTEREST
IN COMMON WITH ELECTORS GENERALLY?

The Law

[85] Section 4(j) of the MCIA provides an exception to the conflict of
interest prohibition if the financial interest of the member is one “which is an

-32-

interest in common with electors generally”. Section 1 provides the following
definition:

“interest in common with electors generally” means a pecuniary
interest in common with the electors within the area of jurisdiction
and, where the matter under consideration affects only part of the
area ofjurisdiction, means a pecuniary interest in common with the
electors within that part”;

[86] In Tuchenhagen v. Mondou, 2011 ONSC 5398 (CanLll) (Div. Ct.), the
court referred to the fact that the ordinary interpretation of “generally” means “in
most cases” or “widely”.

[87] The fact that electors generally have an interest in common relating to the
level of development charges and taxes does not preclude Peter and WCD
having a distinct interest. For example, in Kizell v. Bristol, [1993] O.J. No. 3369
(Gen. Div.), the respondent councillors were owners or employed in retail
businesses. They voted on matters to do with the granting of exemptions under
the Retail Business Holidays Act, R.S.O. 1990, c. R.30. O‘Flynn J. concluded
that, although the general public had an interest in the proposed exemptions, the
respondents had contravened the MCIA because they had a financial interest
that was distinct from the interest of electors generally.

[88] The jurisprudence clearly shows that even though a by-law may apply to
the entire body of electors — what Mayor McCallion’s counsel termed a “by-law of

-33-

general application” — this does not preclude an elected official from having an
additional or distinct personal interest in a matter. Indeed, both can be present.

[89] In Kizell, O’Flynn J. also quoted from Edwards v. Wilson (1980), 31 O.R.
(2d) 442 (Div. Ct.) in which Callaghan J. considered whether councillors who
owned or were associated with businesses near a proposed shopping mall had
acted in a conflict of interest when they voted on two proposals which ultimately
defeated the mall project. Though the mall would have equally served all
residents of the town, this did not preclude these councillors from having an
additional interest. Callaghan J. wrote:

while it is true that all ratepayers were interested in the economic
and social development of the community in a general sense, the
respondents had an “added” interest as persons who might be
expected to benefit directly from the failure of the project

The Evidence

[90] WCD stood to save several million dollars in development charges if even
phase one of its proposed development qualified under the Transitional
Provisions.

[91] In cross-examination Mayor McCallion testified that she would not have
declared a conflict of interest even if she understood that WCD could save $11
million in development charges as a result of the Transitional Provisions.

-34-

Analysis and Conclusion

[92] Mayor McCallion’s first submission was that voting on development
charges can never give rise to a conflict of interest. This is because higher
development charges (assuming prospective developers do not opt to go
elsewhere) tend to reduce taxes and lower development charges tend to
increase taxes. Because all residents have an interest in tax levels, development
charge by-laws are of general application. Thus it was not possible for Mayor
McCallion, or anyone else, to have an interest in the vote on the Transitional
Provisions other than the interest that was shared with electors generally.

[93] l put to counsel the following. Assume a council member is a developer.
Development charges are going up. lf a three month transition period is allowed
the developer cannot qualify. lf, however, a six month transitional period is
allowed the developer can qualify. Can the member move a motion to allow for a
six month transitional period? On behalf of Mayor McCallion it was submitted
“yes”. My conclusion is “no”.

[94] lt is necessary to first identify the financial interest of the member. In my
example, the financial interest of the member is as a developer who stands to
save a substantial amount of money depending on the wording of the transitional
by-law. The proper question is whether this financial interest, namely money
riding on whether the transitional period is three or six months, is an interest “in

-35-

common with electors generally”. To ask the question is to answer it. it is
obviously not an interest in common. The developer has a specific financial
interest quite different from electors generally.

[95] Mayor McCallion further submitted, and l agree, that generally
development charges get passed on to the ultimate purchaser. it is elementary
that to stay in business people need to sell products at a price in excess of the
cost. That does not mean, however, that a developer has no financial interest in
qualifying under a transitional provision. For example, take a condominium
developer who is close to the line in terms of being far enough advanced in the
planning process to qualify under a transition provision. If the developer qualifies
under the transition provision, the condominiums are sold at market prices and
the savings in development charges is money in the pocket of the developer. if
the developer is delayed one month, and fails to qualify under the transitional
provision, the condominiums are sold at the same market prices and the
developer absorbs the increased charges.

[96] The alternative submission on behalf of Mayor McCallion is that WCD
had an interest in common with all other developers who might qualify under the
Transitional Provisions. l do not accept that an interest in common with other
developers in the Region qualifies as an interest in common with electors
generally.

-36-

[97] Counsel for Mayor McCallion raised at the hearing the further argument
that s. 4(b) of the MCIA, which provides a member is not in a conflict by reason
of the member being entitled to receive any benefit offered by the municipality on
terms common to other persons, was applicable. A charge or tax would certainly
not ordinarily be characterized as a “benefit”. Similarly, a transition or delay in
implementing an increased charge or tax is not, in my opinion, a “benefit”.

WAS MAYOR MCCALLION’S DEEMED FINANCIAL INTEREST REMOTE AND
INSIGNIFICANT?

The Law

[98] Section 4(j) of the MCIA provides an exception if the interest of the
member is so remote or insignificant that it cannot reasonably be regarded as
likely to affect the member.

[99] The parties agree that l should apply the objective test formulated by
Mackenzie J. in Whiteley v. Schnurr, [1999] O.J. No. 2575 (Gen. Div.) as follows:

10. […] Would a reasonable elector, being apprised of all the
circumstances, be more likely than not to regard the interest of the
councillor as likely to influence that councillor’s action and decision
on the question? In answering the question set out in such test,
such elector might consider whether there was any present or
prospective financial benefit or detriment, financial or othenivise that
could result depending on the manner in which the member
disposed of the subject matter before him or her.

-37-

The Evidence

[100] l now turn to the circumstances that might be considered by the
reasonable elector in determining whether Mayor McCallion’s deemed financial
interest in WCD was likely to influence her vote.

[101] l focus first on the plans and preparedness of WCD as of the Votes.
While no one from WCD testified, there is reliable evidence from Walker of Lyon
Consulting. The project could only move fon/vard by securing the necessary
planning approvals. Effectively Lyon Consulting was driving the bus and WCD
was providing directions. Walker gave direct evidence as to WCD’s instructions
which effectively dictated whether and how the project proceeded.

[102] A July 19, 2007 meeting was attended by 11 City staff and 11 WCD
representatives. Cook and Munroe, on behalf of WCD, advised that a detailed
site plan application for phase one, including the hotel and conference centre,
would likely be filed in the spring of 2008 with “hopes” of securing a building
permit by fall 2008.

[103] Walker stated that DeCicco first mentioned the proposed increase in
development charges in September-October, that being about the time of the
Votes. Minutes record that, at the start of a meeting on November 21, 2007,
attended by 13 WCD owners and consultants, a plan to try to use the Master Site

-38-

Plan application to try to qualify for the lower development charges was
announced. Walker’s evidence was that he had been informed of this intention a
number of weeks before. Given the urgency, it would only make sense that this
change in plan would be communicated to the entire WCD team as soon as
possible. As such, l find that it was only in November that WCD decided to
accelerate its efforts.

[104] As of the Votes, WCD did not plan to file a site plan application until
the spring of 2008. In that event, WCD would not meet the second requirement
of the Transitional Provisions, namely a complete building permit application, by
February 1, 2008. (As discussed, the Master Site Plan, as of the Votes, lacked
detail and so could not be the basis to apply for or receive a building permit.)

[105] Secondly, WCD lacked money. ln this regard:

(a) Couprie made it clear he would not advance funds beyond the
deposit amount.

(b) Peter lacked resources. Couprie said he had previously loaned
money to Peter, secured by Peter’s house. When Peter defaulted,
Couprie assumed ownership of the house. Peter borrowed the
entire $50,000 that WCD paid to the City as an application fee for
the Master Site Plan.

(c) Lyon, the principal of Lyon Consulting, took a “sliver” of equity
presumably in lieu of some portion of fees.

(d) Walker said that the unwillingness of WCD to pay the requisite City
fees was the main stumbling block to obtaining the necessary
approvals.

 

-39-

(e) As of April 30, 2008, Walker said it became apparent Lyon
Consulting might not get paid for its services. it started to do work
for WCD on a handshake agreement between Lyon and Cook, who
knew one another, and then failed to “paper” the financial
arrangements when Cook stepped aside.

(f) When Cook was taking the lead, his intention was to seek not only a
hotel operator but also a developer partner with deeper pockets.

Analysis and Conclusion

[106] The parties agreed that, applying the test from White/y, a reasonable
elector apprised of all the circumstances would take into account that:

(a)As of the Votes, the intention of WCD was to not apply for building
permit until the spring of 2008, which would not meet the second
requirement of the Transitional Provisions.

(b) As of the Votes, the Master Site Plan was not sufficiently detailed to
allow building permits to issue.

(c) As of the Votes, WCD did not have in place a hotel chain or a major
financial investor.

(d) WCD itself lacked the resources to pay the site plan application fee
and proceed to the building permit stage.

-40-

[107] Counsel for Mr. Hazineh, however, submitted that the reasonable
elector would also take into account that:

(a) WCD’s plan from the outset involved moving from the Master Site
Plans to a more detailed plan.

(b) The process of seeking planning approval commenced in 2006,
even before the APS, and considerable progress had been made by
WCD’s planners, architects and lawyers.

(c) The existing official plan and zoning permitted the proposed
development subject only to removal of the “H” (hold) designation.

(d) The APS had been signed.

(e) This project was supported by Mayor McCallion, Council and staff.

(f) The considerable efforts by WCD after the Votes nearly put it into
position to qualify under the Transitional Provisions.

[108] While l accept that the additional circumstances identified by counsel
for Mr. Hazineh should be considered, the primary focus must be on the situation
as of the Votes. At that time there were multiple layers of improbability. WCD
had no intention of taking the steps necessary to meet the second and third
requirements under the Transitional Provisions. No hotel operator was on board.

-41-

No major financial investor was on board. WCD lacked the funds to pay the site
plan application fee.

[109] A reasonable elector would also consider that Mayor McCallion had
demonstrated greater concern for the public’s interest than for Peter’s interest by
suggesting that the APS contain a provision requiring that the hotel be built first.
This provision caused, or contributed to causing, the project to not proceed.

[110] ln my opinion, a reasonable elector, apprised of all of the
circumstances as of the Votes, would not regard the deemed financial interest of
Mayor McCallion as likely to have influenced her vote. As of the Votes, the
chance that WCD would qualify under the Transitional Provisions was miniscule.
A reasonable elector would have concluded there was no likelihood that Mayor
McCallion’s deemed financial interest would influence her vote.

[111] Lastly, l consider the fact that Mayor McCallion also seconded and
voted on Mayor Fennel’s September 13, 2007 motion which recommended an
extension of the transition period to November 1, 2009, for areas to be identified
by each municipality. l consider this separately as the proposed 18 month
extension arguably presents a different set of circumstances for the reasonable
elector to consider. As passed, the resolution stated it was to amend

-42-

“Recommendation GC-174-2007” contained in the Minutes of the General
Committee of Council held September 6, 2007.

[112] The actual wording of the September 13, 2007 resolution is
ambiguous; it simply refers to the transition period being extended to November
1, 2009. lt would certainly not make sense to change all three milestone dates to
fall on November 1, 2009. The Regional staff presentation to Council on
September 27, 2007, is, however, crystal clear. Under the heading
“interpretation of Proposed Amendment”, staff interpreted the intention as being:

(a) to maintain the requirement to have submitted a site plan
application by September 13, 2007; but

(b) to extend the date to obtain a building permit to November 1,
2009.

[113] While Brampton staff may have had a different intention, the
considered interpretation of Regional staff is reasonable. it was based upon the
wording of the resolution and informed by experience. l find that a reasonable
elector would so interpret the resolution. On this interpretation, the resolution
required a site plan application by September 13, 2007, even earlier than the
Transitional Provisions date of October 7, 2007.

[114] As previously discussed, WCD had not filed a complete site plan
application as of October 7, 2007. if l am wrong, and if WCD can be considered

-43-

as having filed a complete site plan application on July 31, 2007, the September
13, 2007 resolution presented additional layers of improbability.

[115] The distinction between a resolution and a by-law was discussed by
Bielby J. in Tanner v. The Municipality of Brockton, 2011 ONSC 6329 (CanLll).
The Municipal Act, S.O. 2001, ch. 25, provides that a municipality must exercise
its power by by-law. A resolution is usually employed to indicate the intention of
council relating to a particular matter of a temporary nature.

[116] The reasonable elector would have to consider the likelihood of the
recommendation to extend the transition period to November 1, 2009 ever being
enacted. In this regard:

(a) The resolution was akin to a trial balloon proposed with virtually no
advance notice to council members.

(b) The sole impetus for the resolution was a Brampton-specific concern
and the wording was “regionalized” by the clerk according to routine
practice.

(c) The financial implications of the resolution had not been analyzed.

-44-

(d) Regional staff, drawing on Regional Council policy that ‘growth
should pay for growth”, were strongly opposed to implementing the
resolution.

[117] Considering all the circumstances, l conclude that the likelihood that
the September 13, 2007 recommendation would be incorporated in a by~law was
remote. Even if it was, it remained uncertain whether the City would identify an
area that included the proposed WCD development.

[118] As previously discussed, a reasonable elector would also consider
that Mayor McCallion’s suggestion that the APS require the hotel be built first put
the public interest ahead of the interest of WCD.

[119] ln my opinion, a reasonable elector would not regard the deemed
financial interest of Mayor McCallion as likely to have influenced her in seconding
Mayor Fennel’s motion and voting on September 13, 2007.

[120] As such, l conclude that Mayor McCallion did not contravene the
MCIA. l will, however, for the sake of completeness address whether the
defences of error in judgment and inadvertence would be available to her.

-45-

WAS ANY CONTRAVENTION DUE TO INADVERTENCE OR BY REASON OF
AN ERROR IN JUDGMENT?

The Law

[121] The MCIA, s. 10(2) provides that if a contravention was committed
through inadvertence, or by reason of an error in judgment, the member is not
subject to having his or her seat vacated.

[122] in Magder v. Ford, 2013 ONSC 263 (CanLll), the court stated that
inadvertence and error in judgment are “two distinct lines of inquiiy”. As to error
in judgment the court stated:

[90]. . . in order to obtain the benefit of the saving provision in s.
10(2), the councillor must prove not only that he had an honest belief
that the MCIA did not apply; he must also show that his belief was
not arbitrary, and that he has taken some reasonable steps to
inquire into his legal obligations.

[123] As to inadvertence, in Baillargeon v. Carroll, [2009] O.J. No. 502
(S.C.J.), Kelly J. stated:

The defence of inadvertence applies where the breach can be linked
to an oversight of fact or law that was not reckless or wilfully blind.
(See Benn v. Lozinski, [1982] O.J. No. 3356, 1982 CarswellOnt 772
at paras. 33-34 (Co. Ct) and Re Blake and Watts et al (1982), [1973]
O.J. No. 2225, 1973 CarswellOnt 372 at pars. 24-31 (Co. Ct.)

[124] ln Re Blake and Watts et al. [1974], 2 O.R. (2d) 43 (Co. Ct.) Killeen
J. stated:

-46-

The weight of authority, in fact practically all the authorities, are to
the effect that “inadvertently” is a wide enough term to include
ignorance of the law, carelessness, negligence, or inattention… The
dictionaries give various meanings for the word, including
inattention, carelessness or negligence, and for the purpose of this
decision l shall hold that the term “inadvertently” includes ignorance
of the law, inattention, neglect or carelessness, on the part of the
deputy returning officer.

The Evidence

[125] Mayor McCallion knew that Peter was an owner of WCD. She knew
that she had a deemed financial interest in WCD. WCD had proposed a major
development that had been in the City planning process for many months.
Mayor McCallion’s evidence, which is supported by other City witnesses and l
accept, was that she was not briefed on the details or even the status of the
WCD project. She decided that she did not want to know anything.

[126] When Mayor McCallion participated in the Votes she did not know
whether or to what extent a transitional period would benefit WCD. She
participated in the Votes based upon her interpretation of the MCIA which was
that a development charge by-law, and transitional provisions in particular,
cannot give rise to a conflict of interest.

-47-

Analysis and Conclusion

[127] As discussed, l reject the argument that the MCIA permits a member
with an actual or deemed financial interest in a development to vote on the
development charges applicable or potentially applicable to the development. In
my opinion, the belief by Mayor McCallion that she could vote is “arbitrary” within
the meaning of Magder. First, such a belief is contrary to common sense. It
does not pass the “smell” test. Secondly, Mayor McCallion testified she had
attended many municipal education sessions, and read many publications, on
the subject of conflict of interest prior to the Votes. Nothing from these sessions
or publications was cited as supporting her interpretation of the MCIA. As such,
the defence of error in judgment is not available.

[128] Further, having a deemed financial interest in WCD, Mayor
McCallion states that she made no inquiry as to the status of WCD’s application
for planning approval. In my opinion, this constitutes wilful blindness. For all she
knew, the WCD project might have been far enough along that the Transitional
Provisions could have saved WCD several million dollars on the initial phase of
the project.

[129] In my opinion, the defence of inadvertence is also not available.
Mayor McCallion’s evidence was that she deliberately participated in the Votes
based upon herjudgment that there can be no conflict in relation to a

-48-

development charge by-law. Further, as discussed, Mayor McCallion was wilfully
blind in relation to what WCD was doing which also precludes reliance on the
defence of inadvertence.

DID MR. HAZINEH COMMENCE THE APPLICATION IN TIME?

The Law

[130] Section 9 of the MCIA provides that an elector has six weeks to
commence a court application after it comes to the elector’s knowledge that a
member may have contravened the MCIA.

The Evidence

[131] Mr. Hazineh‘s affidavit indicates that in the fall of 2009, he became
interested in allegations of conflict of interest against Mayor McCallion. He
generally followed the Judicial inquiry that took place from December 14, 2009 to
February 11, 2011. The Judicial Inquiry Report was released October 3, 2011.
He read an October 11, 2011 article in the Mississauga News written by Clay
Connor, a municipal lawyer, entitled, “McCallion may not be out of the woods”.
From the article he learned that, in 2007, Mayor McCallion had voted at Regional
Council on transitional development charge provisions which had the potential to
save WCD $9 million. Mr. Hazineh commenced this Application on November
21, 2011.

-49-

[132] At an out of court cross-examination on his affidavit, Mr. Hazineh
was shown an article in the National Post dated July 17, 2010, which reported
that Parrish and six other councillors alleged that Mayor McCallion had violated
the MCIA when, in 2007, she voted at Regional Council on transitional provisions
which could save Peter $11 million on the proposed WCD development. Ms.
Parrish was quoted as saying “l’m absolutely convinced there was a conflict of
interest there . . The article went on to note that Ms. Parrish and the
councillors have a six week window, following their discovery of the conflict of
interest, to launch a legal action.

[133] Mr. Hazineh was asked a number of questions about the article over
five pages of transcript. Mr. Hazineh was then asked:

Q. Did you read this article at the time?

A. l’m sure l did. The picture looks familiar, so l probably read it.

[134] Mr. Hazineh testified in court. He was directed to the apparent
conflict between his affidavit evidence indicating that he first learned about Mayor
McCallion’s conflict of interest from the October 11, 2011 Connor article and his
evidence when cross-examined on his affidavit that he had read the July 17,
2010 National Post article at the time it was published.

-50-

[135] Mr. Hazineh explained that he had come across the National Post
article during the preparation of his court application and incorrectly assumed
that he had read it at the time. He went on to state that he did not read the
National Post on principle given its editorial stance on the Middle East. He said
that his evidence when cross-examined on his affidavit was a mistake, and that
he had not been aware of any possible conflict on the pait of Mayor McCallion at
Regional Council prior to the October 11, 2011 article. He also cited the fact that
in filing his Court Application he used the $9 million figure used in the 2011
article, and not the $11 million figure used in the 2010 article, as additional
evidence that he had not read the 2010 National Post article.

[136] Mr. Hazineh and Parrish could not be much closer. They have been
friends since 1991. He worked as a special assistant to her while she was a
federal M.P. He managed campaigns for her federally and provincially. Their
families socialized. ln July 2010, Mr. Hazineh was managing her election
campaign for municipal council.

Analysis and Conclusion

[137] Let me first consider the two matters Mr. Hazineh identified as
supporting his explanation for the discrepancy in his evidence.

-51-

[138] First, his aversion to the National Post. When Mr. Hazineh was
cross-examined on his affidavit, the July 17, 2010, article was reviewed at length
before he was asked if he had read it at the time. He knew it was from the
National Post. If Mr. Hazineh in fact had a principled objection, and so never
read the National Post, he would have said so. l conclude the National Post
aversion was an after the fact rationalization to explain the discrepancy in his
evidence. Further, while a person might refuse to purchase a particular paper
on principle, it does not make sense that Mr. Hazineh would refuse to even read
an article featuring a picture of his close friend and political ally.

[139] Secondly, his use of the $9 million figure in his Application. l accept
that Mr. Hazineh read the October 11, 2011 article, and it was utilized as the
triggering event beginning the six week period. it follows that he would use the
$9 million figure from that article. Mr. Hazineh would not want to use the $11
million figure from a July 2010, article as it would tend to prove he was out of
time to bring the application.

[140] The two reasons suggested to prefer Mr. Hazineh’s corrected
evidence in court, over his evidence when he was cross-examined on his
affidavit, carry no weight for the reasons discussed. I find it more probable that
Mr. Hazineh’s evidence when cross-examined on his affidavit was true than his
evidence in court. By the time he testified in court, he appreciated that his earlier

-52-

evidence might doom his application to failure. As such, l find as a fact that Mr.
Hazineh read the National Post article in July 2010.

[141] The National Post article contained essentially the same information
as the Connor article. As such, the fact that Mayor McCallion may have
contravened the MCIA came to Mr. Hazineh’s knowledge in July 2010. He
commenced this application long after the six week period prescribed by s. 9 of
the MCIA. Mr. Hazineh’s application must, therefore, also be dismissed on this
ground.

SHOULD THERE BE AN ADVERSE INFERENCE AGAINST MAYOR
MCCALLION?

[142] For the sake of completeness, l will explain why in assessing the
evidence l have not drawn an adverse inference against Mayor McCallion on the
basis that she did not call evidence from Peter, Cook and DeCicco. Whether to
draw an adverse inference must be assessed in light of the issues to be decided.

[143] Peter could have provided evidence regarding his interest in WCD
and whether Mayor McCallion had knowledge of it. For the reasons provided, I
have concluded that Peter was an owner of WCD, and that Mayor McCallion
knew that, without the necessity of resorting to an adverse inference.

-53-

[144] Cook and DeCicco’s evidence would have been most relevant to
WCD’s plans and preparedness as of the Votes. Walker was managing the
project for WCD. Walker was relatively independent and provided detailed
evidence in that regard. At its highest, Mayor McCallion had a friendly relation
with Cook and DeCicco. In my opinion, it would not be appropriate to draw an
adverse inference due to her failure to call these witnesses.

CONCLUSION

[145] The application is dismissed. I would like to thank all counsel for
their thorough and helpful submissions.

[146] If costs cannot be agreed upon Mayor McCallion shall make written
cost submissions within 14 days. Mr. Hazlneh shall respond within 14 days. Any
reply by Mayor McCallion shall be filed within a further seven days.

__________________________Sproat J

Released: June 14, 2013

CITATION: HAZINEH v. MCCALLION, 2013 ONSC 2164
COURT FILE NO.: CV-12-1130-O0
DATE: 2013-06-14
ONTARIO
SUPERIOR COURT OF JUSTICE
BETWEEN:
RE: ELIAS HAZINEH
Applicant
V.
HAZEL McCALLlON
Respondent
REASONS FOR JUDGMENT
Released: June 14, 2013
Sproat J.

Hazel McCallion Conflict-of-interest case dismissed. Her City Hall press conference Jun 14 2013 (24:56 min)


ADDITIONAL RESOURCES

Justice Sproat’s Decision


MISSISSAUGAWATCH court notes

 

Hazel McCallion Conflict of Interest Press Conference. The Press: Rick Drennan, San Grewal, Louise Rosella

Hazel McCallion Conflict of Interest Press Conference. The Press: Rick Drennan, San Grewal, Louise Rosella

Post Linx
Permalink | | Print This Article

ELIAS HAZINEH v. HAZEL McCALLION SUMMARY OF A DECISION OF MR. JUSTICE JOHN R. SPROAT (released June 14, 2013)

June 17th, 2013  

What follows is video of Mississauga Mayor Hazel McCallion’s June 14, 2013 Conflict of Interest press conference and then Justice John Sproat’s “Hazineh vs McCallion” decision.

Hazel McCallion Conflict-of-interest case dismissed. Her City Hall press conference Jun 14 2013 (24:56 min)

 

The Decision released June 14, 2013

 Justice John R. Sproat’s “Hazineh vs McCallion” decision scanned from the Hazineh v McCallion – Summary of Decision_June 14, 2013 (PDF) file. We’ve done our best to ensure that our scan matches Justice Sproat’s original text. Any errors are ours and we’d appreciate being advised as well.

ELIAS HAZINEH v. HAZEL McCALLION

SUMMARY OF A DECISION OF MR. JUSTICE JOHN R. SPROAT

(released June 14, 2013)

INTRODUCTION

[1] This is an application brought by Elias Hazineh (“Mr. Hazineh”) seeking to
have Hazel McCallion (“Mayor McCallion”), the Mayor of the City of Mississauga
(“the City”), removed from office for violating the Municipal Conflict of Interest Act
(“the MCIA”).

[2] in brief, Mr. Hazineh alleges that:

(a) Mayor McCallion’s son Peter McCallion (“Peter”) incorporated and
was an owner of World Class Developments Inc. (“WCD”). WCD
agreed to purchase land for the purpose of constructing a hotel,
conference centre and condominium towers. (The completion of this
transaction was subject to WCD attracting a four star hotel and
obtaining all required planning approvals.)

(b) Mayor McCallion knew Peter had a financial interest in WCD. As
such, the MCIA deems her to have the same financial interest as
Peter for conflict purposes.

(c) Mayor McCallion cast a number of votes at Peel Regional Council
(“Regional Council”) in September-October, 2007 (“the Votes”),
related to increased development charges. As enacted, the by-law
contained provisions (“the Transitional Provisions”) by which
developers who filed a complete site plan application by October 7,

-2-

2007; a complete building permit application by February 1, 2008;
and who obtained a building permit by May 1, 2008, continued to be
eligible to pay the lower rate.

(d) WCD was eligible to qualify under the Transitional Provisions. As
such WCD and Mayor McCallion had a financial interest in the
Votes.

(e) It was not until reading an October 11, 2011 article by municipal
lawyer Clay Connor that Mr. Hazineh learned of Mayor McCallion’s
conflict of interest at Regional Council. As required by the MCIA, he
then commenced a court application within six weeks of learning of
the conflict.

[3]   The issues are as follows:

(a) What was Peter’s interest in WCD? What did Mayor McCallion know
about Peter’s interest in WCD?

(b) Had WCD filed a complete site plan application prior to October 7,
2007, such that it was eligible to qualify under the Transitional
Provisions?

-3-

(c) If WCD was eligible, and so had a financial interest in the
Transitional Provisions, do any of the following MCIA exemptions
apply?:

(i) Was Mayor McCallion’s deemed financial interest an interest
in common with electors generally? or

(ii) Was Mayor McCallion’s deemed financial interest remote and
insignificant such that it cannot reasonably be regarded as
likely to have influenced her?

(d) If Mayor McCallion contravened the MCIA, was the contravention
committed through inadvertence or an error in judgment such that
she should not be removed from office?


DID MAYOR MCCALLION HAVE A DEEMED FINANCIAL INTEREST IN

WCD?

[4] Section 3 of the MCIA provides that if the child of a member has a financial
interest, known to the member, the member is deemed to have the same
financial interest as the child.

-4-

[5] The evidence is overwhelming that Peter was an owner of WCD. For
example, he caused WCD to be incorporated, arranged for a $750,000 loan to
pay a deposit and decided who would be the shareholders and officers.

[6] Mayor McCallion’s evidence was that, at the time of the Votes, she
 understood that Peter’s only interest in WCD was as a real estate agent.

[7] Having regard to the following:

(a) that Mayor McCallion had a close relationship with Peter and a long-
standing interest in the development of a hotel and conference
centre;

(b) that in January 2007 she witnessed documents signed by Peter and
Couprie which indicated clearly that Peter was an owner of WCD;
and

(c) that, within one month after the Votes, she was engaged in the
internal affairs of WCD to the extent that documents to do with the
shareholdings of Cook and DeCicco in WCD were faxed to her home
and DeCicco solicited her advice and assistance to resolve issues
he had with Cook.

 

-5-

 

I find as a fact that, as of the Votes, Mayor McCallion was aware that Peter was
an owner of WCD. Section 3 of the MCIA, therefore, deems Mayor McCallion to
have the same financial interest as Peter.

COULD WCD QUALIFY UNDER THE TRANSITIONAL PROVISIONS?

[8] To qualify under the Transitional Provisions “an application for site plan
approval that is complete” had to have been filed by October 7, 2007.

[9] WCD had only filed a Master Site Plan which is conceptual in nature and
identifies the location of buildings, access points and the general attributes of the
site.

[10] A City by-law required that a site plan application shall not be processed
until the application fee was paid. In the case of WCD the application fee for the
entire project was initially estimated to be $500,000. WCD paid only 10 per cent
of this amount on the filing of the Master Site Plan.

[11] The Master Site Plan application left blank parts of the form intended to
 list the “general requirements” of the plan and the “building elevations”.

[12] I, therefore, conclude that the Master Site Plan application was not a “site
plan application that is complete” within the meaning of the Transitional
Provisions. WCD could not, therefore, qualify under the Transitional Provisions.


-6-

 

As such, WCD had no financial interest in the development charges by-law
adopted by the Region. On that basis alone Mr. Hazineh’s application must be
dismissed.

WAS MAYOR MCCALLION’S DEEMED FINANCIAL INTEREST AN INTEREST
IN COMMON WITH ELECTORS GENERALLY?

[13] Section 4(j) of the MCIA provides an exception to the conflict of interest
prohibition if the financial interest of the member is one “which is an interest in
common with electors generally”.

[14] WCD stood to save several million dollars in development charges if even
phase one of its proposed development qualified under the Transitional
Provisions.

[15] Under s. 4(j) of the MCIA, it is necessary to first identify the financial
 interest of the member. In this case, the deemed financial interest of Mayor
McCallion was that of an owner of WCD. Depending on the wording of the
transitional by-law WCD could save a substantial amount of money. The proper
question then is whether this financial interest, namely money riding on the
wording of the transitional by-law, is an interest “in common with electors
generally”. To ask the question is to answer it. it is obviously not an interest in


-7-

common. Peter and WCD had a financial interest, and Mayor McCallion had a
deemed financial interest, quite different from electors generally.

WAS MAYOR MCCALLlON’S DEEMED FINANCIAL INTEREST REMOTE AND
INSIGNIFICANT?

[16] Section 4(j) of the MCIA provides an exception if the interest of the
member is so remote or insignificant that it cannot reasonably be regarded as
likely to affect the member.

[17] The parties agree that l should apply the objective test formulated by
Mackenzie J. in Whiteley v. Schnurr, [1999] O.J. No. 2575(Gen. Div.) as follows:

10. […] Would a reasonable elector, being apprised of all the
circumstances, be more likely than not to regard the interest of the
councillor as likely to influence that councillor’s action and decision
on the question? ln answering the question set out in such test,
such elector might consider whether there was any present or
prospective financial benefit or detriment, financial or othen/vise that
could result depending on the manner in which the member
disposed of the subject matter before him or her.

[18] The reasonable elector would focus on the plans and preparedness of
WCD as of the Votes, and its financial ability at that time to implement its plans.

-8-

[19] The parties agreed that, applying the test from Whitely, a reasonable
elector apprised of all the circumstances would take into account that as of the
Votes:

(a) the intention of WCD was to not apply for a building permit until the
spring of 2008, which would not meet the second requirement of the
Transitional Provisions.

(b) the Master Site Plan was not sufficiently detailed to allow building
permits to issue.

(c) WCD did not have in place a hotel chain or a major financial
investor.

(d) WCD itself lacked the resources to pay the site plan application fee
and proceed to the building permit stage.

[20] A reasonable elector would also consider that Mayor McCallion had
demonstrated greater concern for the public interest than Peter‘s interest by
suggesting to OMERS, the owner of the land, that the agreement of purchase
and sale require that the hotel be built first. This provision caused, or contributed
to causing, the project to not proceed.

-9-

[21] in my opinion, a reasonable elector, apprised of all of the circumstances
as of the Votes, would not regard the deemed financial interest of Mayor
McCallion as likely to have influenced her vote. As of the Votes, the chance that
WCD would qualify under the Transitional Provisions was miniscule. A
reasonable elector would have concluded there was no likelihood that Mayor
McCallion’s deemed financial interest would influence her vote.

WAS ANY CONTRAVENTION DUE TO INADVERTENCE OR BY REASON OF
AN ERROR IN JUDGMENT?

[22] The MCIA, s. 10(2) provides that if a contravention was committed
through inadvertence or by reason of an error in judgment the member is not
subject to having his or her seat vacated.

[23] If, contrary to my conclusion, Mayor McCallion contravened the MCIA,
her participation in the Votes cannot be characterized as an error in judgement or
inadvertence.

[24] Mayor McCallion participated in the Votes intentionally having formed the
opinion that a vote on development charges cannot give rise to a conflict of
interest. Mayor McCallion went so far as to testify that she would not have
declared a conflict of interest even if she understood that WCD could save $11
million as a result of the Transitional Provisions. This understanding of her legal

-10-

obligations is contrary to common sense. Mayor McCallion was not able to refer
to any municipal law educational seminar or publication prior to the Votes that
supported this interpretation.

[25] Further, Mayor McCallion was wilfully blind to the status of the WCD
development. For all she knew the Transitional Provisions could have saved
WCD millions of dollars on the initial phase of the project. Wilful blindness
precludes reliance upon the defence of error in judgment or inadvertence.

DID MR. HAZINEH COMMENCE THE APPLICATION IN TIME?

[26] Section 9 of the MCIA provides that an elector has six weeks to
commence a court application after it comes to the elector’s knowledge that a
member may have contravened the MCIA.

[27] Mr. Hazineh stated in his affidavit filed in support of his application that he
first learned of Mayor McCallion’s 2007 conflict of interest, related to a
development charge by-law at Regional Council, from an October 11, 2011
article. When cross-examined out of court, however, he stated that he had
probably read a July 17, 2010 article in the National Post which reported the
same allegations.

-11-

[28] Mr. Hazineh testified in court and was directed to this discrepancy. He
testified that on reflection he was in error in stating he had read the National Post
article in 2010. He explained that he did not read the National Post on principle
because of its editorial stance on the Middle East.

[29] lf it was true that Mr. Hazineh never read the National Post it is only
logical he would have stated that when first asked about the National Post article
at his cross-examination. l conclude Mr. Hazineh’s evidence that he never read
the National Post on principle was an after the fact rationalization to explain the
discrepancy in his evidence. l find it more probable that Mr. Hazineh’s evidence
when cross-examined on his affidavit was true than his evidence in court. By the
time he testified in court, he appreciated that his earlier evidence might doom his
application to failure. As such, I find as a fact that Mr. Hazineh read the National
Post article in July 2010.

[30] The National Post article contained essentially the same information as
the October 11, 2011 article. As such, the fact that Mayor McCallion may have
contravened the MCIA came to Mr. Hazineh’s knowledge in July 2010. He
commenced this application long after the six week period prescribed by s. 9 of
the MCIA. Mr. Hazineh’s application must, therefore, also be dismissed on this
ground.

-12-

CONCLUSION

[31] The application is, therefore dismissed.

Hazel McCallion's Councillors, Pat Mullin, Ron Starr, Katie Mahoney and Jim Tovey react to the Mayor's lawyer declaring, "Mayor McCallion won this case and she won it big time."Hazel McCallion’s Councillors, Pat Mullin, Ron Starr, Katie Mahoney and Jim Tovey react to the Mayor’s lawyer
declaring, “Mayor McCallion won this case and she won it big time.”

ADDITIONAL RESOURCES

Justice Sproat’s Decision


MISSISSAUGAWATCH court notes

Hazel McCallion Conflict of Interest Press Conference. The Press: Rick Drennan, San Grewal, Louise Rosella

Hazel McCallion Conflict of Interest Press Conference. The Press: Rick Drennan, San Grewal, Louise Rosella

Post Linx
Permalink | | Print This Article

Hazel McCallion’s Conflict of Interest press conference –and “Hazineh vs McCallion” Summary of Decision pdf files

June 16th, 2013  

What follows is video of Mississauga Mayor Hazel McCallion’s June 14, 2013 Conflict of Interest press conference. And then Justice John Sproat’s “Hazineh vs McCallion” decision.

Hazel McCallion Conflict-of-interest case dismissed. Her City Hall press conference Jun 14 2013 (24:56 min)


ADDITIONAL RESOURCES

Justice Sproat’s Decision


MISSISSAUGAWATCH court notes

 

Hazel McCallion Conflict of Interest Press Conference. The Press: Rick Drennan, San Grewal, Louise Rosella

Hazel McCallion Conflict of Interest Press Conference. The Press: Rick Drennan, San Grewal, Louise Rosella

Post Linx
Permalink | | Print This Article

Let’s play WHERE’S PROL? Can you find someone photographed with David Suzuki who perhaps is a printer?

June 11th, 2013  

In our June 1, 2013 blog, we introduced Mississauga News online commenter “Prol” who also used the alias “AV8R” until he accidentally outed himself.

Why is Prol of interest? For lots of reasons but mostly because Prol co-designed and printed the “Friends of Hazel” rally poster —The very poster that Carolyn Parrish ripped up in a restaurant back in December 2009.

For the record, here is Prol’s complete comment as posted on December 28, 2010

Prol

Dec 28, 2010 10:21 PM——-

TO REALLY SET THE RECORD STRAIGHT!

It is NOT a myth. YOU DID IT! It is YOUR actions that made it a “legend”. It was NOT a “postcard” it was a poster. I would know as I co-designed it and printed it. What does it matter whether the poster had the Mayor’s picture on it? (That’s MAYOR with a capitol M btw) There may be some minor embellished elements to the story floating about. So what? The truth is still that you continually expose your classless side and try to mitigate it by redirecting attention and blame it on others. The voters of Ward 6 had enough of it and you lost. Now step aside. It’s time to move on!

Agree 5     Disagree 3                           Report Abuse 3

Here are just a few hints that Prol shared about his true identity in his Mississauga News online comments.

1. He co-designed and printed the Friends of Hazel Rally poster –the very poster that Ron  Starr “gifts” Hazel McCallion at the official opening of his campaign headquarters.

2. Prol implies that he’s attended at least one Mississauga Summit.

3. Best of all he announced that there are photographs with him and David Suzuki. Prol wrote, “There are pictures of me at an event celebrating with David Suzuki.”

As we all know, the word “pictures” implies more than one photo.


So for fun, let’s play WHERE’S PROL?

Can you find someone photographed with David Suzuki (below) who perhaps is a printer?….

Can YOU find Mississauga News commenter Prol in these photos of David Suzuki at Mississauga Summit 2009?

To examine these David Suzuki photographs more closely, see page 5 at:   www.flickr.com/photos/unitedwaypeel/sets/72157618922827112/page5  Enjoy!

Next. In yet another comment Prol also announced that he’s “a private pilot” —and something of an aviation buff….

More to follow…

 

Signed,
MISSISSAUGAWATCH

Mississauga News online comments, "I worked for Bonnie (Crombie), but not on the front lines."  -- Prol. "The LAST thing a politician can do is tell the straight up truth." -- Prol

Post Linx
Permalink | | Print This Article

Mayor Hazel McCallion’s Mississauga News online commenter, Mantis. “[My father] was a Toronto police officer”…

June 3rd, 2013  

Last blog, we announced that the Mississauga News changed its website design on May 24, 2013 and deleted all readers comments. In that entry, we introduced Mississauga News online commenter “Prol” who also used the alias “AV8R” until he accidentally outed himself.

I will state again for the record that I have not posted comments at the Mississauga News since Summer 2011. The few exceptions were those times when one of the commenters would claim that I was “ForTheTruth” or some new alias to the site.

We-here can never quite decide who is Mayor Hazel McCallion’s #1 online supporter —Prol or Mantis.

But it’s Mantis who defies the laws of Probability. Here’s why.

Believe it or not, two males exist, both the same age, both growing up in Mississauga, both having a father who was a Toronto Police officer patrolling the streets for looters during the 1979 Mississauga Train Derailment. That’s actually not the tough part to believe —that both hide behind the alias “Mantis” is.

Mantis at the Mississauga News:

Mantis

May 4, 2013 10:05 PM

@katt62

It was a great example. My father was on the scene that night too and his assessment is very different from that of RocketRoger. He was a Toronto police officer – living in Mississauga – who was one of hundreds seconded to Peel Regional Police during the emergency. He was one of those patrolling the deserted streets keeping looters out and he talks about encountering pockets of chlorine gas miles away from the derailment site – clinging to ditches and other low lying areas. There was at least one chlorine tanker that was ruptured and leaked a sizeable cloud of chlorine gas into the air. That gas posed a very serious risk to people and the only sensible decision was the one that was made – the evacuate anyone who could possibly be in the way of that cloud.

Agree       Disagree        Report Abuse

And Mantis at zombiehunters.org

Re: Pulling the Trigger: have you ever bugged out?

Postby mantis » Tue Nov 27, 2012 11:17 pm

I did as a child – just over 33 years ago in an event that became known as “The Mississauga Miracle” or the “Mississauga Train Derailment”….

…At the time, my father was a police officer with the Toronto Police Service and he was sent to Mississauga to aid in patrolling for looters (there were none amazingly) and assisting with evacuations. I remember my mother waking us kids up in the middle of the night and getting us dressed and having us throw somes clothes and toys into suitcases. We were a good 20 miles from ground zero but the sky was bright red and there were police vehicles going up and down the streets with bull horns telling people to evacuate the area immediately. We headed north to my grandparents house in Erin, Ontario and spend the next three days watching the disaster unfold on TV. For an 8 year old, it was pretty scary but it was fun having three or four days off school!

The Mississauga News Mantis and the Zombiehunters Mantis --a comparative

That’s not all.  Both these Mantises also made the front page of the 1979 Mississauga News posing with their brother, a string of fish —and Mayor Hazel McCallion!

Here’s Mantis at the Mississauga News with his fish tale.

Mantis

Feb 13, 2011 9:08 PM

Happy Birthday Mayor McCallion!

That was quite the event today and I’m glad to it did such a thorough job of exposing the lies and delusions of that band of idiots around here, one of whom just the other day claimed that there was a massive groundswell against the mayor! I shook hands with the mayor again today and I gave her a copy of an old Mississauga News picture from 1979. It was a franed front page newspaper clipping that showed my younger brother and I posing with the mayor holding a whole stringer of fish caught during the Lake Acquataine fishing derby. My mother had saved the photo and I scanned it, printed it and framed it for her. She was quite pleased with it.

Agree        Disagree 6     Report Abuse 3

And then there’s the same two Mantises who both had an altercation with a driver flashing a fake police badge at a Mississauga Tim Hortons!…

And of course there’s more….

Here’s an example of an email that Mike “Mantis” Webster sent me back on Tuesday, September 23, 2008.

Author : Mike Webster (IP: 99.229.10.189 , CPE0080c80bc00d-CM0019474d4a10.cpe.net.cable.rogers.com)
E-mail : webstermr@rogers.com
URL    :
Whois  : http://ws.arin.net/cgi-bin/whois.pl?queryinput=99.229.10.189
Comment:

You can’t even come up with a cogent reply to my comment – more disjointed rambling nonsense on par with the really hilarious wacky stuff on the Torstar site!

See Mantis’ reference to the Toronto Star?

Mike Mantis Webster also uses the alias “Mantis” at the Toronto Star as well.

And both the Mantises who comment at the Mississauga News and the Toronto Star are 15th generation Canadian! Imagine the odds!

Mike "Mantis" Webster (Toronto Star) "15th generation Canadian" and Mantis Mississauga News 15 generations

Follow the link and you will see Mantis comment on a Mother’s Day letter he wrote as Mike Webster:  www.thestar.com/life/parent/2013/05/09/mothers_day_messages_of_love_for_mom.html

Prol and Mantis are Mayor Hazel McCallion’s most ardent supporters —even as they hide behind their aliases. Both also regard themselves as shining examples of the kind of exemplary citizens that the Mississauga Mayor attracts to her fold.

And once again, here’s Prol (aka AV8R)…

Cheers,
MISSISSAUGAWATCH

"It was NOT a 'postcard' it was a poster. I would know as I co-designed it and printed it." -- Prol, Mississauga News online commenter

 

Post Linx
Permalink | | Print This Article

Mississauga News online comment, “TO REALLY SET THE RECORD STRAIGHT!” ….”I would know as I co-designed it and printed it.”

June 1st, 2013  

The Mississauga News changed its website design on May 24, 2013 and deleted all readers comments. For the record, I have not posted comments at the Mississauga News since Summer 2011. The few exceptions were those times when one of the commenters would claim that I was “ForTheTruth” or some new alias to the site.

So how could I go from being a prolific commenter at the Mississauga News to not commenting at all? It was surprisingly easy.

Today we introduce Mississauga News online commenter “Prol” who also used the alias “AV8R” until he accidentally outed himself.

Why is Prol of interest? For lots of reasons but mostly because Prol co-designed and printed the “Friends of Hazel” rally poster —The very poster that Carolyn Parrish ripped up in a restaurant back in December 2009.

For the record, here is Prol’s complete comment as posted on December 28, 2010


Prol

Dec 28, 2010 10:21 PM——-

TO REALLY SET THE RECORD STRAIGHT!

It is NOT a myth. YOU DID IT! It is YOUR actions that made it a “legend”. It was NOT a “postcard” it was a poster. I would know as I co-designed it and printed it. What does it matter whether the poster had the Mayor’s picture on it? (That’s MAYOR with a capitol M btw) There may be some minor embellished elements to the story floating about. So what? The truth is still that you continually expose your classless side and try to mitigate it by redirecting attention and blame it on others. The voters of Ward 6 had enough of it and you lost. Now step aside. It’s time to move on!

Agree 5     Disagree 3                           Report Abuse 3

The following image includes photographs of Ron Starr giving Mayor Hazel McCallion an “unrippable” copy of the “Friends of Hazel” Rally poster during his campaign headquarters Open House.

A beaming Lorry Smith applauds as Starr presents this gag gift to the Mayor. Then Smith poses with both Starr and McCallion —and the “unrippable” Rally poster.

A quick Google search easily confirms that Lorry R Smith is President of Proactive Print Management and Councillor Ron Starr’s election financial statement confirms that Lorry Smith’s Proactive Print printed $1,370.00 worth of election signs for Starr in the 2010 municipal election.

Imagine. Both Prol and Lorry Smith are printers…. whodathunkit…

"It was NOT a 'postcard' it was a poster. I would know as I co-designed it and printed it." -- Prol, Mississauga News online commenter

Is the Lorry Smith who left this “the dark one” message at stopcarolynparrish.com the same Lorry Smith of Proactive Print Management, Ron Starr’s election sign printer?

Is the Lorry Smith who left a comment at stopcarolynparrish.com Ron Starr's Lorry Smith (Starrs' election sign printer?)

Cheers,
MISSISSAUGAWATCH